SWW Floating walls and suspended ceilings complete the isolation. Walls should be resting on a continuous SWW pad, if not on the floating floor and sealed at the top with AB-716 angle brackets. Buckling is prevented by means of DNSB sway braces or the simpler WIC or WCL commonly used with fabricated walls. All of…

AB-716

AB-716 Floating walls and suspended ceilings complete the isolation. Walls should be resting on a continuous SWW pad, if not on the floating floor and sealed at the top with AB-716 angle brackets. Buckling is prevented by means of DNSB sway braces or the simpler WIC or WCL commonly used with fabricated walls. All of…

NPS

NPS  Floating walls and suspended ceilings complete the isolation. Walls should be resting on a continuous SWW pad, if not on the floating floor and sealed at the top with AB-716 angle brackets. Buckling is prevented by means of DNSB sway braces or the simpler WIC or WCL commonly used with fabricated walls. All of…

WIC

WIC Floating walls and suspended ceilings complete the isolation. Walls should be resting on a continuous SWW pad, if not on the floating floor and sealed at the top with AB-716 angle brackets. Buckling is prevented by means of DNSB sway braces or the simpler WIC or WCL commonly used with fabricated walls. All of…

DNSB

DNSB Floating walls and suspended ceilings complete the isolation. Walls should be resting on a continuous SWW pad, if not on the floating floor and sealed at the top with AB-716 angle brackets. Buckling is prevented by means of DNSB sway braces or the simpler WIC or WCL commonly used with fabricated walls. All of…

Form Work & Wooden Floating Floors

FORM-WORK & WOODEN FLOATING FLOORS The alternate, almost obsolete, method is one whereby a continuous layer of the isolation media is used as a pouring surface. More commonly, individual isolators, the thickness of the air gap are placed in position in the field and covered with plywood or factory attached to plywood before delivery. The…

Jack-Up Floating Floors

MASON JACK-UP FLOOR SLAB SYSTEM We believe that the most fool-proof and safest way to establish the air gap is the jack-up or lift-slab method. Plastic sheeting is placed on the sub-floor as a breaker layer, isolators are placed on the plastic sheeting, reinforcing steel or mesh rests on the isolator housings, and the concrete…

Architectural Ceiling Hangers

ARCHITECTURAL CEILING HANGERS Our recommendations are always based on our best spring products because the additional cost is low compared to the risk of poor performance. Hanger cost is a small percentage of an acoustical ceiling and it is most important that these sensitive systems are installed with the very best chances of success. Primitive Spring hangers…

Isolated Walls

ISOLATED WALLS To complete an envelope, secondary walls must be introduced with the same consideration given to mass and air gap as covered in the floor discussion. The problem is simpler, because the walls normally support only their own weight and they need not have the structural strength of the floor. Poured concrete or concrete…